scope of work concrete pump place finish Related Information

Concrete Finishing – Use Conco's Experts For Your Project

Concrete Finishing – Provide Your Project the Best. At The Conco Companies we bring our expertise and unsurpassed reputation to concrete finishing services along with a range of services that include design, formwork, pumping, reinforcing, and shotcrete. Our place and finish crews are among the most experienced in the Western U.S. and provide services for all types of projects.

STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT …

Article 1.1 Scope of Work The Work covered by these Specifications consists of providing all plant, labor, equipment supplies, material, transportation, handling, and storage, and performing all operations necessary to complete the construction of hot mix asphalt concrete pavement consisting of

PROJECT BIDDING DOCUMENT - Trellis

b. Bids will ONLY be accepted on Attachment C - "Bid Form & Scope of Work". Place the Bid Form on top of your submittal so that it is the first visible document when the package is removed from the envelope. A complete and acceptable Bid Form requires line item budgets for each task listed on the Scope of Work.

SCOPE OF WORK CONCRETE PUMP, PLACE & FINISH …

1.2 SCOPE OF WORK DETAILS A. The Contractor shall provide the Emerald Heights development, Concrete Pumps and Concrete Placing and Finishing Labour as may be required by the Owner and satisfactory to the project Structural Engineers and the Construction Manager, for the following quoted prices: 1. Concrete Pump Only Prices: 32 meter Boom Pump

SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1: …

Cast-In-Place Concrete Revised June 2013 03 30 00-1 SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1: GENERAL 1.01 SCOPE OF WORK Provide concrete for structures such as water pump stations, wastewater lift station, storage tanks, underground junction boxes, thrust blocking, manhole

EXAMPLE SCOPE OF WORKS InFormed Construction Process

John/Kieran and our site supervisor to ensure the level of finish and accuracy of work is as per plans. o This allows for site visits with Owners, meetings on site with all trades and making Priced on plain grey concrete with a standard broom finish Concrete Pump this item in the cabinetry scope of work

STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT …

Article 1.1 Scope of Work The Work covered by these Specifications consists of providing all plant, labor, equipment supplies, material, transportation, handling, and storage, and performing all operations necessary to complete the construction of hot mix asphalt concrete pavement consisting of

TRADE SCOPE OF WORK REQUIREMENTS CONTACT …

Finish the exposed concrete surfaces on many ty pes of construction projects. These projects range from small jobs, such as the finish of patios, floors and sidewalks, to work on dams, concrete highways, foundations and walls of buildings, and airport runways. GED, age 18, valid MI driver's license, pre-job training 586.757.6668 / 248.548.0800

DIVISION 37 MASONRY 37.01 SCOPE: 37.02 MATERIALS

37.01 SCOPE: The work in this section includes the furnishing of all labor, materials, equipment and other incidentals to construct the masonry walls, door and woodwork for the pumping station in accordance with the Contract Documents and BOCA code. 37.02 MATERIALS: A. Concrete Masonry Units: Shall be hollow load-bearing concrete block walls

Guide Specification for Structural Shotcrete Walls

20 Shotcrete • Winter 2008 2.1.4 A list of the proposed shotcreting equipment, including brand name, model, and capacity of proposed pump and air compressor. 2.1.5 Results of the preconstruction testing program and a description of the proposed construction quality control testing program, including the frequency of specific tests. 2.1.6 Details of proposed scaffolding, man lifts, or other

DIVISION - SCOPE OF WORK - New York City

Concrete, Concrete paving, and Concrete cellar slab. Wood joists, wood studs and Wood trim. Remove all finish materials from all partitions shown on drawings as "existing to remain" and from the interior face of exterior masonry walls. Master Guide SCOPE OF WORK for Rehabilitation Projects.

CHAPTER 5 - FOUNDATION REQUIREMENTS

outside finish grade unless: 1. Adequate gravity drainage to a posi-tive out fall is provided, or 2. The permeability of the soil and the location of the water table is such that water will not collect in the crawl space, or 3. Drain tile and automatic sump pump system …

SCOPE OF WORK

Scope of Work Package – Issued for Tender 1. SCOPE OF WORK This document outlines the scope of work to perform the localized repairs to the cast-in-place concrete columns and beams at the National Gallery of Canada. Work is to be completed in the spring of 2017. The general scope of work …

Scope of Work Southampton Busway Concrete Repair May 2021

Scope of Work – Southampton Busway Concrete Repair – May 2021 2 |of 3 Scope of Work: Provide all project management, factory and field engineering, supervision, labor, material, tools, rentals, test equipment and transportation to complete the work. 1. Place traffic protection around work zone (minimum: cones and caution tape). Work is

SECTION 13150 WATER FEATURE PART 1 - GENERAL 1.1 …

1.1 SCOPE OF WORK A. The Contractor shall perform all work necessary to complete the Contract in a Air Place Concrete shall be used for Water Feature Construction. All of the exposed finish surfaces of Water Feature system ponds, stream sidewalls and streambeds, waterfalls, etc, …

Method Statement for Construction of Manhole Chambers and

Dec 04, 2020 · Manhole floor benching is made after pipes installation with manholes walls, where site made plywood shuttering (where needed) will be placed to the dimensions shown in approved shop drawings, Grade SRC C20/25 concrete of an approved mix will be poured by means of a concrete pump or manually, top of surface will be working with a good finish.

SCOPE OF WORK CONCRETE SUPPLY EMERALD HEIGHTS

(PDF) Method statement- Concreting Work (Broom Finish

DIVISION 37 MASONRY 37.01 SCOPE: 37.02 MATERIALS

37.01 SCOPE: The work in this section includes the furnishing of all labor, materials, equipment and other incidentals to construct the masonry walls, door and woodwork for the pumping station in accordance with the Contract Documents and BOCA code. 37.02 MATERIALS: A. Concrete Masonry Units: Shall be hollow load-bearing concrete block walls

CHAPTER 5 - FOUNDATION REQUIREMENTS

outside finish grade unless: 1. Adequate gravity drainage to a posi-tive out fall is provided, or 2. The permeability of the soil and the location of the water table is such that water will not collect in the crawl space, or 3. Drain tile and automatic sump pump system …

REQUEST FOR PROPOSAL PACKET Pump House #1 …

Scope of Work . OVERVIEW. At the Allegan County Services Complex located at 3285 122nd Avenue, Allegan, MI . 49010, Contractor shall disconnect utilities and remove the existing deteriorating Pumphouse #1 structure and replace like for like with a new CMU block and/or alternatively cast in place concrete building and reconnect utilities.